Rabu, 01 Juni 2011

CIREBON POWER PLANT


  PLTU Cirebon Electric Power ( PT. CEP )





Cirebon power plant project development started in 2009 with acapacity of 1 x 660 MW and requires funding of about U.S. $ 850million. Poyek was undertaken by PT. PT Doosan Heavy IndustriesIndonesia. South Korean company as its Main Contractor. In Cirebon power plant construction project is not just one company but the project was on sub it to another contractor, including:

- For work done by civilians in PT. Aston
- To work on the mechanical and piping by PT. Coins Pratt
- To work on Electrical and Instruments by PT. Kencana Jaya andPT. Tekniko

To note the shareholders of PT Cirebon Electric Power consists of:

1. PT Indika Energy Tbk (20 percent)
2. Samtan Co. Ltd. (20 percent)
3. Korea Midland Power Co. (27.5 percent)
4. Marubeni Corporation (32.5 percent)

In this article I tried to explain the process of high voltage 150 KV /660 MW.
  • Switchyard
  • Transformer Station
  • Auxalary Unit Transformer
  • Generator Transformer
  • Excitation Transformer
  • Switchgear




    Tidak ada komentar:

    Posting Komentar